An email or a call is enough. If it is easier to show us, we come and look.
Projects and hardware
Bigger jobs, quoted before they start.
New servers, office moves, Microsoft 365 migrations and new computers. You get a written estimate before work begins, and a call from us before anything runs more than 20% over it.
How this is covered
- Fully Managed
- Quoted as a project
- Maintenance + Monitoring
- Quoted as a project
Everyday changes stay in the plan. On Fully Managed, setup of computers bought through us is included.
Compare the plansHow project work goes
Five rules we quote by.
Project work is where most IT bills surprise people. These rules are how we keep ours from doing that.
Project terms
Agreed before work starts
2hours
An estimate before we start
Anything outside your plan that we expect to take more than two hours gets a written estimate, and your OK in writing, before work begins. An email reply is enough.
$135an hour, in 15-minute steps
Hourly, or a fixed price
Billed in 15-minute increments at our hourly rate, or a fixed price agreed in writing. The estimate says which.
20%over the estimate
We stop and talk
If a project looks like running more than 20% over the estimate, we stop and talk to you before carrying on.
After 5or on a weekend
Riskier changes, out of hours
Work that could interrupt your day, like a server move or a firewall swap, is usually scheduled after hours, with your agreement. After-hours rates apply, and the estimate shows them.
1change at a time
With a way back
Changes go in one at a time, with a way to undo each one wherever that is possible. If something misbehaves, we know which change did it.
The two-hour estimate, the 15-minute increments and the 20% rule are written into our service agreement.
What we take on
The projects that come up most.
For the organizations we look after on a monthly plan. Not a client yet? Start with the plans and a quote.
01After hours
New and replacement servers
When a server reaches end of support or runs out of room: a new one, or a move to the cloud where that suits you better.
02Weekend
Storage upgrades
Aging disks moved to solid-state storage, with a fallback ready if anything misbehaves.
03
Moving to Microsoft 365
Email, files and sign-in moved from Gmail, an old server or another host, with mail delivery checked at the end.
04
Office moves and new buildings
Network, Wi-Fi, internet and computers ready before your staff walk in.
05After hours
Firewalls and Wi-Fi
Business-grade firewalls with intrusion prevention, and guest Wi-Fi kept apart from your own.
06
Backup internet
Cellular or satellite failover, so the office stays online when the main line drops.
07
Cameras
Camera systems and recorders, installed, set up and handed over with the access you need.
08After hours
Windows upgrades
Done in the evening, so nobody loses a working day to a progress bar.
09
End-of-life equipment
Computers, servers, firewalls and switches past their support dates, replaced on a plan instead of in a hurry.
From first call to invoice
What happens, in order.
The same six steps whether it is one new laptop or a new building.
Tell us what you need
A written estimate
What we will do, how long it should take, any equipment with its price, and what your plan already covers. Hourly or a fixed price: the estimate says which.
Your OK, in writing
An email reply is enough. Nothing is ordered and no work starts until then.
Scheduled around you
Changes that could interrupt your day are usually planned for after hours or a weekend, one at a time, with a way back wherever that is possible.
The work, with a check-in
If it looks like running more than 20% over the estimate, we stop and talk to you before going on.
An invoice that matches
Time in 15-minute increments, equipment as quoted. Hourly work arrives on your next monthly invoice.
Hardware
Quoted before it is bought.
We keep no stock, so there is nothing to push. We quote what fits the job, order it when you say yes, and set it up.
Build sheet
Every new computer
- Monitoring and updates from the first day
- Threat detection, watched 24/7 by a security operations center
- Staff sign in without administrator rights
- The person’s files moved over
- Recorded in your documentation
Our standard build, before it reaches a desk
- Quoted in advance. Model, price and warranty in writing before anything is ordered.
- Ordered after you approve. Business-grade equipment, usually Dell, chosen to last.
- Checked before it reaches you. We read the manufacturer’s quote line by line and take out extras nobody asked for.
- Set up for you. On Fully Managed, setup and moving the person’s files are included for computers bought through us.
- Warranty claims handled. On Fully Managed, when something fails under warranty, we deal with the manufacturer.
- Bought it elsewhere? That is fine. We set it up at $135 an hour.
Work like this
Recent projects, without the names.
- Moved an accounting firm’s data from an aging disk array to solid-state storage over a weekend, without taking its main server out of service.
- Replaced a small law firm’s server and battery backup, and set up secure remote access, during an office move.
- Retired an expensive hosted server by moving a company’s inventory system to its vendor’s cloud.
- Moved a law firm’s email from Gmail to Microsoft 365.
- Networked a new production building, with fiber internet and satellite failover.
- Added 5G cellular failover so a nonprofit office stays online when its main internet drops.
- Upgraded most of an office’s computers to Windows 11 in a single evening, after hours.
The honest part
Where project costs can still move.
An estimate made in good faith can still meet a surprise inside an old system. Here is what can change, and how you will hear about it.
- An estimate is an estimate. Old systems hide surprises. When one turns up, you hear it from us before the bill passes the 20% line.
- Lead times are the manufacturer’s. We hold no stock, so equipment arrives when it ships.
- Prices move. Hardware quotes are valid for seven days, and freight is added.
- Returns can cost. Some returns carry the manufacturer’s restocking fee.
- After hours costs more. Work scheduled outside 8 to 5 is billed at after-hours rates, and the estimate shows it.
What counts as a project rather than plan work?
Everyday changes are plan work: a new user, a password, moving someone to another computer, setting up a computer bought through us on Fully Managed. A project adds, moves or redesigns something: a new server, an office move, a migration, a new firewall. If we are not sure which it is, we say so before we start, not on the invoice.
Hourly or fixed price?
Either. Hourly at $135 an hour in 15-minute increments, against a written estimate, or a fixed price agreed in writing when the scope is clear. The estimate says which.
Do we have to buy hardware through you?
No. Buying through us means it is quoted, ordered and set up for you, and on Fully Managed the setup is included. If you buy elsewhere, we set it up at $135 an hour.
What happens if a project runs over?
If it looks like going more than 20% over the estimate, we stop and talk to you before carrying on: what we found, what it changes and what the options are.
Do you take on a project if we are not a client?
No. Projects, hourly help and hardware are for the organizations on one of our monthly plans. If you are not a client yet, see the plans or get a quote. A second opinion on someone else's quote is free to anyone.
Can you help us plan for replacing old equipment?
Yes. We can look at the age of your computers, servers and network equipment with you and help turn it into a year-by-year budget, so replacements are planned rather than rushed. Networks and Wi-Fi covers the network side.
Have a project in mind?
Get it in writing before it starts.
Already a client? Tell us what you are planning. You get a written estimate with the work, the equipment and the price, and nothing happens until you say yes.
- Call(406) 241-6995
- Already a client?[email protected]